60% Construction Documents

60% Construction Documents

Public Works and Engineering (PWE) Engineering and Construction Division invites Contractors to provide constructability comments on upcoming construction projects. This web based review process supports communication and collaboration between PWE and the Contractor community.

 

Process for submitting your comments On-line:

On the Bidsets page, select 60% Construction Documents from the Featured Menu

  • Contractors must register in order to download the documents. Project Documents include 90% Submittal Plans and the Project Manual. All other associated information is not available for comment.
  • Comment review – Download the “Comment Log” (registration is not required). Submit one comment Log per project. Fill out the Comment Log per the instructions on the Log. The reviewer’s name and contact information must be included.
  • Comment Log Submittal – E-mail the comment log in excel or pdf; to PWE-ENGCCL@houstontx.gov Place in the subject line “Project Name_WBS No.xx-3”. MAXIMUM FILE SIZE 7MB. Please note that a confirmation receipt notice will not be provided. If comments require supporting documents please attach to the e-mail (pdf files only).

 

Information to the Reviewer:

  • All comments received on the 60% Bid Documents by the Contractor are for information only and are not part of the City’s comment submittal process. 
  • The submitted comments does not solicit bids or guarantee comment incorporation.
  • All Documents are subject to removal after published comment due date.
  • For assistance please submit your questions to PWE-ENGCCL@houstontx.gov .

 

 

Documents

WBS-N-210005-0001-3 40% Submittal WBS-N-210005-0001-3 40% Submittal

Roseland Area Drainage and Paving Improvements
Comment Log
Comments due by February 09, 2018
If you have any questions, please contact Project Manager: Jing Chen, P.E., (832)395-3092

WBS-S-000600-0050-4 60% Submittal WBS-S-000600-0050-4 60% Submittal

Rehabilitation of Water Storage Tanks at Various Location – Package 10
Project Manual S-000600-0050-4
Comment Log
Comments due by April 09, 2018
If you have any questions, please contact Project Manager: Jay Patel, P.E., (832)395-2369

WBS-S-000900-0165-4 60% Submittal WBS-S-000900-0165-4 60% Submittal

108-Inch Water Line Along City Easements From Aldine Westfield Rd. to Willis St.
Project Manual S-000900-0165-4
Comment Log
Comments due by March 02, 2018
If you have any questions, please contact Project Manager: Kevin D. Tran, P.E., (832)395-2242

WBS-S-000900-0168-4 60% Submittal WBS-S-000900-0168-4 60% Submittal

108-Inch Water Line Along City Easements from Imperial Valley Dr. to Green Plaza Dr.
Project Manual S-000900-0168-4
Comment Log
Comments due by March 07, 2018
If you have any questions, please contact Project Manager: Tuan Tran, (832)395-2323

WBS-S-000900-0166-4 60% Submittal WBS-S-000900-0166-4 60% Submittal

66-Inch Water Line Interconnection along W. Hardy Rd. from Beltway 8 to Greens Rd.
Project Manual S-000900-0166-4
Comment Log
Comments due by March 22, 2018
If you have any questions, please contact Project Manager: Kevin D. Tran, P.E., (832)395-2242

WBS-M-410015-0001-4 60% Submittal WBS-M-410015-0001-4 60% Submittal

Magnolia Park Section 2 Area Drainage and Paving Improvements
Specification Division 1 - Specification Division 2-4
Comment Log
Comments due by April 02, 2018
If you have any questions, please contact Project Manager: Edward Ochoa, EIT, (832)395-2336

WBS-N-100029-0001-4 60% Submittal WBS-N-100029-0001-4 60% Submittal

Kirkwood Paving and Drainage: Buffalo Bayou to Briar Forest
Comment Log
Comments due by April 30, 2018
If you have any questions, please contact Project Manager: Mohd Warrad, P.E., (832)395-2219

WBS-N-210005-0001-4 60% Submittal WBS-N-210005-0001-4 60% Submittal

Roseland Area Drainage and Paving Improvements
Project Manual N-210005-0001-4
Comment Log
Comments due by March 30, 2018
If you have any questions, please contact Project Manager: Jing Chen, P.E., (832)395-3092

WBS-S-000900-0134-4 60% Submittal WBS-S-000900-0134-4 60% Submittal

72-inch Water Line from Crawford to Mt. Vernon
Project Manual S-000900-0134-4
Utility Conflict Exhibits - Utility Conflict List - Utility Submission Log
Comment Log
Comments due by April 25, 2018
If you have any questions, please contact Project Manager: Oke Atatah, P.E., (832)395-2308

WBS-S-000900-0167-4 60% Submittal WBS-S-000900-0167-4 60% Submittal

108-Inch Water Line Along City Easements from Willis St. to Imperial Valley Dr.
Project Manual S-000900-0167-4
Comment Log
Comments due by April 17, 2018
If you have any questions, please contact Project Manager: Kevin Tran, (832)395-2242

WBS-S-000701-0036-4 60% Submittal WBS-S-000701-0036-4 60% Submittal

60% Plan Review of S-000701-0036-3: Large Diameter Valve Replacement -Package 2
Project Manual S-000701-0036-4 
Report QTO - Report SWTP & Construction Checklist
Comment Log
Comments due date: June 01, 2018
If you have any questions, please contact Project Manager: Singarpal S. Sekhon, P.E., CCM & Oke Atatah, P.E., (832) 395-2320

WBS-S-000012-0031-4 60% Submittal WBS-S-000012-0031-4 60% Submittal

SEWPP Improvements - Facility Rehab, Sludge Disposal Expansion and Metering Station Rehab
Project Manual S-000012-0031-4
Comment Log
Comments due date: May 31, 2018
If you have any questions, please contact Project Manager: Jay Patel, P.E., (832) 395-2369

WBS-S-000900-0135-4 60% Submittal WBS-S-000900-0135-4 60% Submittal

72-inch water line along Kipling, Woodhead & Branard, from Mt. Vernon to Greenbriar
Project Manual S-000900-0135-4
Comment Log
Comments due by June 08, 2018
If you have any questions, please contact Project Manager: Singarpal S. Sekhon, CCM & Oke Atatah, P.E., (832)395-2320

WBS-N-100009-0001-4 60% Submittal WBS-N-100009-0001-4 60% Submittal

Antoine Paving & Drainage from Hammerly to Hempstead Hwy
Summary of Work N-100009-0001-4
Comment Log
Comments due by June 29, 2018
If you have any questions, please contact Project Manager: Jason Samkutty, (832)395-3067

WBS-S-000701-0024-4 60% Submittal WBS-S-000701-0024-4 60% Submittal

Rehabilitation of Above Grade crossing Package 2
Project Manual S-000701-0024-4 
Comment Log
Comments due date: N/A
If you have any questions, please contact Project Manager: Fedelis Atatah, P.E., (832) 395-2308

WBS-R-000035-0012-4 60% Submittal WBS-R-000035-0012-4 60% Submittal

Wastewater Force Main Renewal and Replacement – Sleepy Hollow and Telephone Road No. 1
Project Manual R-000035-0012-4
Comment Log
Comments due date: August 18, 2018
If you have any questions, please contact Project Manager: Bonnie Tai, P.E., (832) 395-3961

WBS-N-000751-0001-4 60% Submittal WBS-N-000751-0001-4 60% Submittal

West Alabama Paving and Drainage: Buffalo Speedway to Weslayan
Project Manual N-000751-0001-4
Comment Log
Comments due date: August 17, 2018
If you have any questions, please contact Project Manager: Stephen M. Campagna, (832) 395-2225

WBS-N-100022-0001-4 60% Submittal WBS-N-100022-0001-4 60% Submittal

West Bellfort Paving and Drainage: S. Wilcrest to US 59
Project Manual N-100022-0001-4
Comment Log
Comments due by August 24, 2018
If you have any questions, please contact Project Manager: Stephen M. Campagna, (832)395-2225

WBS-S-000600-0051-4 60% Submittal WBS-S-000600-0051-4 60% Submittal

Rehabilitation of Ground Water Wells – Package 11
Project Manual S-000600-0051-4
Comment Log
Comments due by September 06, 2018
If you have any questions, please contact Project Manager: Jay Patel, P.E., (832)395-2369

WBS-N-210004-0001-4 60% Submittal WBS-N-210004-0001-4 60% Submittal

Cloverland Paving & Drainage
Comment Log
Comments due by September 07, 2018
If you have any questions, please contact Project Manager: James Bielstein, P.E., (832)395-2378

WBS-M-420HUD-012A-4 60% Submittal WBS-M-420HUD-012A-4 60% Submittal

Bonita Gardens Drainage and Paving Improvements
Comment Log
Comments due date: N/A
If you have any questions, please contact Project Manager: Prakash Luetel, P.E., (832)395-2436

WBS-R-000267-0128-4 60% Submittal WBS-R-000267-0128-4 60% Submittal

Lift Station Renewal and Replacement - Ayreshire, Brompton, Bradford, and Kirby Drive #2
Project Manual R-000267-0128-4
Comment Log
Comments due by November 26, 2018
If you have any questions, please contact Project Manager: Bonie Tai, P.E., (832)395-3961

WBS-M-410005-0001-4 60% Submittal WBS-M-410005-0001-4 60% Submittal

Spring Shadows North Drainage and Paving
Project Manual M-410005-0001-4
Comment Log
Comments due by December 15, 2018
If you have any questions, please contact Project Manager: Amanda Marshall, P.E., (832)395-3070

WBS-N-000389-001A-4 60% Submittal WBS-N-000389-001A-4 60% Submittal

NSR-460 Paving and Drainage
Comment Log
Comments due by November 19, 2018
If you have any questions, please contact Project Manager: Sam Habibi, P.E., (832)395-2283

WBS-M-410039-0001-3 60% Submittal WBS-M-410039-0001-3 60% Submittal

Cottage Grove East Drainage and Paving Improvements
Comment Log
Comments due by February 07, 2019
If you have any questions, please contact Project Manager: James Bielstein, P.E., (832)395-2378

WBS-R-000536-0024-4 60% Submittal WBS-R-000536-0024-4 60% Submittal

Facilities Consolidation: Chelford City Diversion Package 1
Comment Log
Comments due by March 04, 2019
If you have any questions, please contact Project Manager: Bashar Khalil, CCM, (832)395-2241

WBS-M-410004-0001-3 60% Submittal WBS-M-410004-0001-3 60% Submittal

Little York, Courtlandt Meadows and York Meadows Drainage and Paving
Project Manual M-410004-0001-3 - Cost Estimate M-410004-0001-3
Comment Log
Comments due by March 05, 2019
If you have any questions, please contact Project Manager: Rowaidah Ayoub, P.E., (832)395-2206

WBS-R-000536-0027-3 60% Submittal WBS-R-000536-0027-3 60% Submittal

Chelford City Diversion Package 2
Project Manual R-000536-0027-3
Comment Log
Comments due date: Currently Available for Private Utility Reviews
If you have any questions, please contact Project Manager: Mohammad Haider, P.E., (832)395-2951

WBS-S-000900-0166-4 75% Submittal WBS-S-000900-0166-4 75% Submittal

66-inch Water Line Interconnection along W. Hardy Rd. from Beltway 8 to Greens Rd.
Project Manual S-000900-0166-4
Comment Log
Comments due by March 01, 2019
If you have any questions, please contact Project Manager: Kevin D. Tran, P.E., (832)395-2242

WNS-N-T03003-0001-3 60% Submittal WNS-N-T03003-0001-3 60% Submittal

Bagby Street Improvement Project
Comments Spread Sheet - Response to Comments Spread Sheet
Interoffice Memo - Summary Inspections
Comment Log
Comments due date: Currently Available for Private Utility Reviews
If you have any questions, please contact Project Manager: Alvin Watts, (832)395-3203
© 2019. All rights reserved. City of Houston