90% Construction Documents

90% Construction Documents

Public Works and Engineering (PWE) Engineering and Construction Division invites Contractors to provide constructability comments on upcoming construction projects. This web based review process supports communication and collaboration between PWE and the Contractor community.

 

Process for submitting your comments On-line:

On the Bidsets page, select 90% Construction Documents from the Featured Menu

  • Contractors must register in order to download the documents. Project Documents include 90% Submittal Plans and the Project Manual. All other associated information is not available for comment.
  • Comment review – Download the “Comment Log” (registration is not required). Submit one comment Log per project. Fill out the Comment Log per the instructions on the Log. The reviewer’s name and contact information must be included.
  • Comment Log Submittal – E-mail the comment log in excel or pdf; to PWE-ENGCCL@houstontx.gov Place in the subject line “Project Name_WBS No.xx-3”. MAXIMUM FILE SIZE 7MB. Please note that a confirmation receipt notice will not be provided. If comments require supporting documents please attach to the e-mail (pdf files only).

 

Information to the Reviewer:

  • All comments received on the 90% Bid Documents by the Contractor are for information only and are not part of the City’s comment submittal process. 
  • The submitted comments does not solicit bids or guarantee comment incorporation.
  • All Documents are subject to removal after published comment due date.
  • For assistance please submit your questions to PWE-ENGCCL@houstontx.gov .

 

Documents

WBS-S-000035-0212-4 90% Submittal WBS-S-000035-0212-4 90% Submittal

Water Line Replacement in Memorial Bend and Briar Forest Area
Project Manual S-000035-0212-4
Comment Log
Comments due by January 04, 2017
If you have any questions, please contact Project Manager: Sabeen Shaikh, P.E., (832)395-2307

WBS-N-100024-0001-4 90% Submittal WBS-N-100024-0001-4 90% Submittal

Hirsch Road Paving Aad Drainage From Crosstimbers To Laura Koppe
Project Manual N-100024-0002-4
Comment Log
Comments due by January 26, 2017
If you have any questions, please contact Project Manager: Azar Ahmadian, P.E., (832)395-2221

WBS-S-000035-0228-4 90% Submittal WBS-S-000035-0228-4 90% Submittal

Water Line Replacement in Briar Court Area
Project Manual S-000035-0228-4
Comment Log
Comments due by January 31, 2017
If you have any questions, please contact Project Manager: Sabeen Shaikh, P.E., (832)395-2307

WBS-R-000265-0096-4 90% Submittal WBS-R-000265-0096-4 90% Submittal

Upper Brays Wastewater Treatment Plant Improvements
Project Manual R-000265-0096-4
Comment Log
Comments due by March 10, 2017
If you have any questions, please contact Project Manager: Gauher Khan, P.E., (832)395-2295

WBS-M-000296-009B-4 90% Submittal WBS-M-000296-009B-4 90% Submittal

Berry Bayou Detention Basin C506-02 Addition (M-000296-009B-4)
Project Manual M-000296-009B-4
Comment Log
Comments due by March 24, 2017
If you have any questions, please contact Project Manager: Kevin Hammond, P.E., (832)395-2275

WBS-S-000066-0020-4 90% Submittal WBS-S-000066-0020-4 90% Submittal

Northeast Water Purification Plant (NEWPP) Improvements - Package I
Project Manual S-000066-0020-4
Comment Log
Comments due by May 04, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-S-000900-0131-4 90% Submittal WBS-S-000900-0131-4 90% Submittal

72-inch Water Line from Dowling to Tuam along Polk, Hutchins, Clay, Chenevert, Hadley and Crawford
Project Manual S-000900-0131-4
Comment Log
Comments due by May 26, 2017
If you have any questions, please contact Project Manager: Arthur Morris, P.E., (832)395-2317

WBS-S-000100-0019-4 90% Submittal WBS-S-000100-0019-4 90% Submittal

New/Replacement Ground Water Well – District 203
Project Manual S-000100-0019-4
Comment Log
Comments due by May 31, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-S-000100-0020-4 90% Submittal WBS-S-000100-0020-4 90% Submittal

New/Replacement Ground Water Well – White Oak
Project Manual S-000100-0020-4
Comment Log
Comments due by May 31, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-R-000267-0122-4 90% Submittal WBS-R-000267-0122-4 90% Submittal

Lift Station Renewal and Replacement – East Park Ten, Maxey Road, Mesa Drive, Westmont, and North Shore
Project Manual R-000267-0122-4
Comment Log
Comments due by June 12, 2017
If you have any questions, please contact Project Manager: Gauher Khan, P.E., (832)395-2295

WBS-R-000265-0129-4 90% Submittal WBS-R-000265-0129-4 90% Submittal

WCID #111 Wastewater Treatment Plant Improvements
Project Manual R-000265-0129-4
Comment Log
Comments due by May 23, 2017
If you have any questions, please contact Project Manager: Gauher Khan, P.E., (832)395-2295

WBS-S-000200-0024-4 90% Submittal WBS-S-000200-0024-4 90% Submittal

Rehabilitation of Ground Water Wells
Comment Log
Comments due by June 08, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-M-000284-0002-4 90% Submittal WBS-M-000284-0002-4 90% Submittal

Airline Drive Drainage Improvements Sub-Project 2
Project Manual M-000284-0002-4
Comment Log
Comments due by June 16, 2017
If you have any questions, please contact Project Manager: Prakash Luetel, P.E., (832)395-2436

WBS-M-410001-0002-4 90% Submittal WBS-M-410001-0002-4 90% Submittal

Woodshire Drainage and Paving Improvements Subproject 2
Comment Log
Comments due by June 30, 2017
If you have any questions, please contact Project Manager: Craig Hutson, P.E., (832)395-2394

WBS-S-001000-0051-4 90% Submittal WBS-S-001000-0051-4 90% Submittal

Groundwater Facility/Re-Pump Station Improvements – Package II
Project Manual S-001000-0051-4
Comment Log
Comments due by July 21, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-M-000700-0001-4 90% Submittal WBS-M-000700-0001-4 90% Submittal

Kress Street Drainage and Paving (Larimer to Clinton)
Comment Log
Comments due by August 11, 2017
If you have any questions, please contact Project Manager: Ellen Maas, P.E., (832)395-2217

WBS-S-000600-0049-4 90% Submittal WBS-S-000600-0049-4 90% Submittal

Rehabilitation of Water Storage Tanks - Package 9
Project Manual S-000600-0049-4
Comment Log
Comments due by September 01, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-M-410006-0001-4 90% Submittal WBS-M-410006-0001-4 90% Submittal

Arlington Heights Area Drainage and Paving Improvements (Sub-Project 1)
Project Manual M-410006-0001-4
Comment Log
Comments due by September 07, 2017
If you have any questions, please contact Project Manager: Prakash Luetel, P.E., (832)395-2436

WBS-S-001000-0042-4 90% Submittal WBS-S-001000-0042-4 90% Submittal

Groundwater Water Facility/Re-Pump Stations/HVAC & Ventilation System Improvements at Various Locations – Package 1
Project Manual S-001000-0042-4
Comment Log
Comments due by September 15, 2017
If you have any questions, please contact Project Manager: Tina Yao, P.E., (832)395-2324

WBS-M-430220-0004-3 90% Submittal WBS-M-430220-0004-3 90% Submittal

Sharpstown Detention Basin Rehabilitation
Project Manual M-430220-0004-3
Plans M-430220-0004-3
Comment Log
Comments due by September 1, 2017
If you have any questions, please contact Project Manager: Prakash Luetel P.E., (832)395-2436

WBS-S-000900-0174-4 90% Submittal WBS-S-000900-0174-4 90% Submittal

120-Inch Water Line, With 96-Inch Stub Out, Along City Easements from NEWPP to East of Union Pacific Railroad
Project Manual S-000900-0174-4
Comment Log
Comments due by September 26, 2017
If you have any questions, please contact Project Manager: Kevin D. Tran, P.E., (832)395-2242

WBS-R-000267-0129-4 90% Submittal WBS-R-000267-0129-4 90% Submittal

Lift Station Renewal and Replacement for MacGregor #2, Eppes, Kellogg, Scott #2, Glengyle, and WCID #73 Lift Stations
Project Manual R-000267-0129-4
Comment Log
Comments due by October 16, 2017
If you have any questions, please contact Project Manager: Tanu Hiremath, P.E., (832)395-2291

WBS-R-000536-0023-4 90% Submittal WBS-R-000536-0023-4 90% Submittal

Fountain View Regional Lift Station Construction and Abandonment of Westheimer No. 1 Lift Station
Project Manual R-000536-0023-4
Comment Log
Comments due by October 16, 2017
If you have any questions, please contact Project Manager: Tanu Hiremath, P.E., (832)395-2291

WBS-N-321039-001B-4 90% Submittal WBS-N-321039-001B-4 90% Submittal

Roadway Pavement Replacement Project Miles St, Park Manor St and Surrey Square St
Project Manual N-321039-001B-4
Comment Log
Comments due by October 20, 2017
If you have any questions, please contact Project Manager: Nawaraj Panta, P.E., (832)395-2057

WBS-M-430241-006H-3 90% Submittal WBS-M-430241-006H-3 90% Submittal

FY2013 Flood Gauge and Flood Warning System Construction Work Order Work Order No. 8 (WBS No. M-430241-006H-3)
Project Manual M-430241-006H-3
Comment Log
Comments due by October 08, 2017
If you have any questions, please contact Project Manager: Kevin Hammond, P.E., (832)395-2275

WBS-S-000900-0154-4 90% Submittal WBS-S-000900-0154-4 90% Submittal

108-Inch Water Line Along City Easements from Union Pacific Railroad to John Ralston Road
Project Manual S-000900-0154-4
Comment Log
Comments due by November 20, 2017
If you have any questions, please contact Project Manager: Kevin D. Tran, P.E., (832)395-2242

WBS-S-000900-0155-4 90% Submittal WBS-S-000900-0155-4 90% Submittal

108-Inch Water Line Along City Easements from John Ralston Road to Bellows Falls Lane
Project Manual S-000900-0155-4
Comment Log
Comments due by November 20, 2017
If you have any questions, please contact Project Manager: Kevin D. Tran, P.E., (832)395-2242

WBS-S-000012-030B-4 90% Submittal WBS-S-000012-030B-4 90% Submittal

SEWPP Improvements at TM1 and TM2 – Package 2
Project Manual S-000012-030B-4
Comment Log
Comments due by January 17, 2018
If you have any questions, please contact Project Manager: Jay Patel, P.E., (832)395-2369

WBS-R-002011-087A-4 90% Submittal WBS-R-002011-087A-4 90% Submittal

Neighborhood Sewer System Improvements - Eastwood, R-002011-087A-4
Project Manual R-002011-087A-4
Comment Log
Comments due by February 19, 2018
If you have any questions, please contact Project Manager: Ewa Chmiel, P.E., (832)395-2292

WBS-R-000265-0118-4 90% Submittal WBS-R-000265-0118-4 90% Submittal

Kingwood Central WWTP Improvements
Project Manual R-000265-0118-4
Comment Log
Comments due by June 12, 2017
If you have any questions, please contact Project Manager: Marilena Stoica, P.E., (832)395-2305

WBS-M-000247-0001-4 90% Submittal WBS-M-000247-0001-4 90% Submittal

90% Design Review For Nottingham Area Drainage and Paving Improvements
Project Manual M-000247-0001-4
Comment Log
Comments due by March 22, 2018
If you have any questions, please contact Project Manager: Roel E. Huerta, P.E., (832)395-2285

WBS-R-000267-121B-4 90% Submittal WBS-R-000267-121B-4 90% Submittal

Abandonment and Flow Diversion of Interwood, M.U.D. #266, and Vickery Lift Stations
Project Manual R-000267-121B-4
Comment Log
Comments due date: October 3, 2016 (Available for Private Utility Reviews)
If you have any questions, please contact Project Manager: Bonnie Tai, P.E., (832)395-3961

WBS-N-000798-0001-4 90% Submittal WBS-N-000798-0001-4 90% Submittal

N-000798-0001-4 Memorial Drive Paving and Drainage – Memorial at Eldridge Intersection
Project Manual N-000798-0001-4 - Updated Design Plans for Memorial & Eldridge
Comment Log
Comments due date: NO DUE DATE
If you have any questions, please contact Project Manager: Hasan Ahmed, (832)395-3088